The Logic of the Assembly
Existing masonry can't be wrapped from outside on most projects, so this system works from the interior: a continuous smart vapor retarder as the airtight layer, insulation selected to keep the old wall's moisture balance workable, and disciplined tie-ins at windows, floors, and penetrations. The historic wall keeps doing what it has always done — the new layers manage air and vapor deliberately.
This documentation is general, principle-based guidance. Masonry retrofits are moisture-sensitive and building-specific; the assembly for your project should be reviewed by your design professional of record.
Layers & Components
Airtight Layer
A continuous interior smart vapor retarder, laps taped, drawn unbroken around the section — see Membranes and Tapes.
Connections
Window and door tie-ins with pre-folded corners; floor and party-wall junctions detailed before the finish schedule closes them.
Penetrations
Dedicated gaskets and seals for services — improvised sealant at a pipe is where retrofits leak.
Fresh Air
A tightened building needs a ventilation plan — pair this assembly with the Ventilation & HRV department.